केन्द्रीय जल आयोग द्वारा अन्य कार्य के लिए निविदा
CWC Tender for other Works
(**कृपया शुद्धिका देखें Please see Corrigendum )
निविदा सं Tender No. |
कार्य /आपूर्ति का विवरण Name of Work |
कार्यालय का नाम Name of Office |
अंतिम तारीख Last Date of acceptance |
|---|
|
No. 04/21/2011-RDD/177-78 |
Supply and Installation of surface water information system. | RD Directorate | On or before 1st march 2012 upto 1500 hrs |
| No. I/1/HQS/BCH/Vol-I/0409/01-10 Dt. 02/01/2012 | LOWER NARMADA SUB DIVISION , OPP Kshetrapal Health Center, Sagrampura, Surat- 395 002 | on or before 11/01/2012 up to 1330 hrs | |
|
No.UYD/HQ-22/2011/36-55 Dated 02.01.2012 |
UPPER YAMUNA DIVISION Room No 201,Kalindi Bhawan, B-5, Tara crescent,Q.I.Area, New Delhi-110016 |
on or before 10.01.2012 up to 15:00 hours |
|
| No.UYD/HQ-22/2011/ 6029-48 Dated 31.12.2011 | UPPER YAMUNA DIVISION Room No 201,Kalindi Bhawan, B-5, Tara crescent,Q.I.Area, New Delhi-110016 | on or before 10.01.2012 up to 15:00 hours | |
| No.D-14016/30/2011-SDO (HQ)/332-40 Dated 26.12.2011 | PCP Directorate,211(S), Sewa Bhawan,R.K.Puram, New Delhi-110606 | 06.01.2012 up to 3.00 PM | |
| No.Mahi Div./09W/04/10/HQ-MD/ Dt. |
Construction of steps down to river at S/G line at site Paderdi Badi. |
MAHI DIVISION , 3rd Floor, Narmada Tapi Bhawan , Sector 10-'A' Gandhinagar-342010 | latest by 15.00 hours on or before 09.01.12 |
| No.Mahi Div./09W/04/10/HQ-MD/ Dt. |
Construction of Gate pillars with fencing & temporary shed at Sapawada. |
MAHI DIVISION , 3rd Floor, Narmada Tapi Bhawan , Sector 10-'A' Gandhinagar-342010 | latest by 15.00 hours on or before 09.01.12 |
| No.Mahi Div./09W/04/10/HQ-MD/ Dt. | MAHI DIVISION , 3rd Floor, Narmada Tapi Bhawan , Sector 10-'A' Gandhinagar-342010 | latest by 15.00 hours on or before 09.01.12 | |
| No. MID/JEHQ-2/2011-12/2551-53 Dt.30/12/2011 | MEGHHNA INVESSTIGATIONN DIVISIONN YINNGYAR VILLA, LUMPYNGNGAD, Shillong-793014 | by 16.00 hours on or before 27.01.2012 | |
| No.Mahi Div./09W/04/10/HQ-MD/5310-19/ Dt.14/12/2011 | MAHI DIVISION , 3rd Floor, Narmada Tapi Bhawan , Sector 10-'A' Gandhinagar-342010 | by 15.00 hours on or before 30.12.2011 | |
|
No.MD/HOC/W-5/2010/1528-32 Dt.14/12/2011MD/HOC/W-5/2010/1591-94
Dt.26/12/2011
|
Repair of HO Circle Office Building CWC Maithon *Corrigendum |
HOC, CWC, Post- Maithon Dam, Dhanbad | by 11.00 hours on or before 28.12.2011 |
| p~ saM : mamaMÀ09W/04/10/HQ-MD/ idnaaMk : | MAHI DIVISION , 3rd Floor, Narmada Tapi Bhawan , Sector 10-'A' Gandhinagar-342010 | by 15.00 hours on or before 09.01.12 | |
| p~ saM : mamaMÀ09W/04/10/HQ-MD/ idnaaMk : | MAHI DIVISION , 3rd Floor, Narmada Tapi Bhawan , Sector 10-'A' Gandhinagar-342010 | by 15.00 hours on or before 09.01.12 | |
| p~ saM : mamaMÀ09W/04/10/HQ-MD/ idnaaMk : |
Construction of temporary shed at telemetry site Swaroopganj |
MAHI DIVISION , 3rd Floor, Narmada Tapi Bhawan , Sector 10-'A' Gandhinagar-342010 | by 15.00 hours on or before 09.01.12 |
| No. DD/DB/Tender/2011-12 / 2547-58 dated :-20 / 12/2011 | OFFICE OF THE EXECUTIVE ENGINEER DAMODAR DIVISION, APCAR GARDEN (WEST) ASANSOL-713304 | up to 15.00 at 10.01.2012 | |
| No. /2011/4237-42 Dt.17/12/2011 | P&I Division, Central Water Commission Quarter no: 1061-1064, Type V, NH-IV FARIDABAD-121001(Haryana) | up to 15:00 hrs on 24/12/2011 | |
| MD/HQ/SO-02./2011-121191-95 15/12/2011 |
PROVIDING & FIXING VITRIFIED Floor TILES AT MAHANADI DIVISION CWC, BURLA |
MAHANADI DIVISION CENTRAL WATER COMMISSION DOCTORS COLONY BURLA, DIST.: SAMBALPUR PIN : 768 017 (ORISSA) | DATE : 27.12.2011 TIME : 15=00 hours |
| No.D-14016/D&R/2011-SDO (HQ)/307-20Dated 19.12.2011 | PCP Directorate,211(S), Sewa Bhawan, R.K.Puram, New Delhi-110606 | latest by 1500 Hrs on 28.12.2011 | |
| CH.Div/HQ-35/2011/7073-81/ Dt.20/12/2011 | Executive Engineer, Chambal Division, CWC 84/93-96, Ajay Marg, Pratap Nagar, Sanganer, Jaipur | Up to 28/12/2011(15:00hrs) | |
| MD/HQ/SO-02./2011-12/1196-1200 Dt.15.12.2011 | MAHANADI DIVISION CENTRAL WATER COMMISSION DOCTORS COLONY BURLA, DIST.: SAMBALPUR PIN : 768 017 (ORISSA) | DATE : 27.12.2011 TIME : 15=00 hours | |
| MD/HQ/SO-02./2011-12/1164-67 Dt.09.12.2011 | MAHANADI DIVISION CENTRAL WATER COMMISSION DOCTORS COLONY BURLA, DIST.: SAMBALPUR PIN : 768 017 (ORISSA) | up to 3.30 P.M. on 16.12.2011 | |
| MD/HQ/SO-02./2011-12/1160-63 Dt.09.12.2011 | MAHANADI DIVISION CENTRAL WATER COMMISSION DOCTORS COLONY BURLA, DIST.: SAMBALPUR PIN : 768 017 (ORISSA) | up to 3.30 P.M. on 16.12.2011 | |
| No.Mahi Div09W/04/10/HQ-MD/ Dt. |
Construction of compound wall with fencing for sub division office building, Kadana. |
MAHI DIVISION , 3rd Floor, Narmada Tapi Bhawan , Sector 10-'A' Gandhinagar-342010 | 15.00 hours on or before 30.12.11 |
| No.Mahi Div09W/04/10/HQ-MD/ Dt. |
Construction of steps down to river at S/G line at site Paderdi Badi. |
MAHI DIVISION , 3rd Floor, Narmada Tapi Bhawan , Sector 10-'A' Gandhinagar-342010 | 15.00 hours on or before 30.12.11 |
| No.Mahi Div09W/04/10/HQ-MD/ Dt. |
Construction of Gate pillars with fencing & temporary shed at Sapawada. |
MAHI DIVISION , 3rd Floor, Narmada Tapi Bhawan , Sector 10-'A' Gandhinagar-342010 | 15.00 hours on or before 30.12.11 |
| No.Mahi Div./09W/04/10/HQ-MD/ Dt. | MAHI DIVISION , 3rd Floor, Narmada Tapi Bhawan , Sector 10-'A' Gandhinagar-342010 | 15.00 hours on or before 30.12.11 | |
| MD/HQ/SO-02/.2011-12/ 1183-88 Dt.13.12.2011 | MAHANADI DIVISION CENTRAL WATER COMMISSION DOCTORS COLONY BURLA, DIST.: SAMBALPUR PIN : 768 017 (ORISSA) | up to 27.12.2011 | |
| No. ERD/AB/NIQ/11-12/1040-42 Dated : 05-12-2011 | Eastern Rivers Division Plot No. A-13 & 14; Bhoi Nagar Bhubaneswar – 751022 | on or before 3.00 P.M. of 15-12-2011. | |
| No. TDS/ NIT / 2011 /6386-99 Dated 09/12/2011 |
Construction of Telemetry room for Watch & Ward & Renovation of site office etc. |
TAPI DIVISION , OPP Kshetrapal Health Center, Sagrampura, Surat- 395 002 | up to 1500 hours of 27/12/2011 |
| No. UYD/Veh/2011/5826-35 Dated, 09.12.2011 | UPPER YAMUNA DIVISION Room No 201, Kalindi Bhawan, B-5, Tara Crescent, Q.I.Area, New Delhi-110016 | on or before 20.12.2011 upto 15.00 hours | |
| No. UYD/WL/2010/5826-35 Dated, 09.12.2011 | UPPER YAMUNA DIVISION Room No 201, Kalindi Bhawan, B-5, Tara Crescent, Q.I.Area, New Delhi-110016 | on or before 20.12.2011 upto 15.00 hours | |
| No.M.Div/09W/04/10/HQ-MD/ Dt. |
“Cleaning and Sweeping of CWC offices at Narmada-Tapi Bhawan, Gandhinagar ” |
MAHI DIVISION 3rd Floor, Narmada Tapi Bhawan Sector 10-'A' Gandhinagar-342010 | latest by 15.00 hours on or before 23/12/2011 |
| Letter No. 3/11/RDD-2011/ 4745-46 Dated:-02.12.2011 | RIVER DATA DIRECTORATE 2nd Floor, Wing-4, West Block-1 R. K. Puram, New Delhi-110605 | on or before 9th December, 2011 at 15:00 hrs. | |
| No. ERD/HQS-8/11/1024-1039 Dated : 05 - 12 -2011. | Eastern Rivers Division Plot No. A-13 & 14; Bhoi Nagar Bhubaneswar – 751022 | on or before 15-12-2011 at 1500 hour. | |
| No.LGD/W-15/2011/2342-48 Dt.05/12/2011 | Lower Ganga Division 26/1,S.S Sen road Berhampore Murshidabad (WB) | Up to14/12/2011 (15:00 hrs) | |
| EE/G/NIQ-MGD3-2011-12/Tender document for Construction of tiles Work. |
CONSTRUCTION OF FLOOR TILES, DESMOLISHING PARTION (BRICK) WALL & COLOUR WASHING OF CONFRENCEHALL |
Executive Engineer Middle Ganga Division -3 Central Water Commission Varanasi- 221002 | up to 03:00 P.M. on 16.12.2011 |
| No: MD/HQ/SO-02/2011-12/ 1124-28 Dt. 01.12.2011 | OFFICE OF THE EXECUTIVE ENGINEER MAHANADI DIVISION, DOCTORS COLONY BURLA-768017, Dist: SAMBALPUR (ORISSA) | on or before 13.00 hours on 12.12.2011 | |
| No: MD/HQ/SO-02/2011-12/ 1118-23 Dt. 01.12.2011 | OFFICE OF THE EXECUTIVE ENGINEER MAHANADI DIVISION, DOCTORS COLONY BURLA-768017, Dist: SAMBALPUR (ORISSA) | 12/12/2011 | |
| No: MD/HQ/SO-02/2011-12/1086-89 Dated. 16/11/2011 |
printing and supply of Office file folders ,file board , Register, Forms etc. |
OFFICE OF THE EXECUTIVE ENGINEER MAHANADI DIVISION, DOCTORS COLONY BURLA-768017, Dist: SAMBALPUR (ORISSA) | up to 03.30 P.M. on 05.12.2011 |
| No. 01/Div/Bho./CWC/11-12/ 4181-94 Dt.28/11/2011 | Narmada Division, Bhopal | Narmada Division, Bhopal | |
| No. ERD/AB/NIQ/11/986-89 Dated : 14-11-2011 | EASTERN RIVERS DIVISION PRACHI TARANGINI BHAWAN PLOT No.A-13 & 14; BHOINAGAR BHUBANESWAR-751022 | on or before 2.00 P.M. of 16-12-2011. | |
| No. 22/06/2011-PCP/2128-40 Dt. 23/11/2011 | PCP Directorate | DATE : 02.12.2011 TIME : 13=00 hours | |
| No. 04/21/2011-RDD/4676-77 Dt. 28-11-2011 | RD.Dte | 16/12/2011 , up to 4:00 PM | |
| IFB No.4/50/2011/NSWDC- RDD/ Dt.28/11/2011 |
Up gradation and maintenance of surface water data entry system (SWDES) software |
RD.Dte | 22/12/2011 , up to 3:00 PM |
| CWC/SMD/IV-6A/08/2815 Dated 25/11/2011 |
NOTICE INVITING TENDER FOR RATE CONTRACT OF CATRIDGES *Hindi Version |
Software Management Directorate. CWC, New Delhi | 13th Dec 2011, Time : 3:00 P.M |
| No. MD/HQ/S.O.-02/2011-12/1060-64/Dt.11/11/2011 | Construction of Telemetry Pillar at Site Dharamjaigarah. | MAHANADI DIVISION CENTRAL WATER COMMISSION DOCTORS COLONY BURLA, DIST.: SAMBALPUR PIN : 768 017 (ORISSA) | DATE : 01.12.2011 TIME : 13=00 hours |
| No. MD/HQ/S.O.-02/2011-12/1065-79/Dt.11/11/2011 | Construction of Telemetry Pillar at Site Surajgarah. | MAHANADI DIVISION CENTRAL WATER COMMISSION DOCTORS COLONY BURLA, DIST.: SAMBALPUR PIN : 768 017 (ORISSA) | DATE : 01.12.2011 TIME : 13=00 hours |
| No. MD/HQ/S.O.-02/2011-12/1070-74/Dt.11/11/2011 | Construction of Telemetry Pillar at Site Simga. | MAHANADI DIVISION CENTRAL WATER COMMISSION DOCTORS COLONY BURLA, DIST.: SAMBALPUR PIN : 768 017 (ORISSA) | DATE : 01.12.2011 TIME : 13=00 hours |
| No. MD/HQ/S.O.-02/2011-12/1075-79/Dt.11/11/2011 | Construction of Telemetry Pillar at Site Thethetanger. | MAHANADI DIVISION CENTRAL WATER COMMISSION DOCTORS COLONY BURLA, DIST.: SAMBALPUR PIN : 768 017 (ORISSA) | DATE : 01.12.2011 TIME : 13=00 hours |
|
NIT No. PCP/04/2011 |
Repair of Steel and Wooden Furniture in Central Water Commission, Sewa Bhawan, R.K. Puram, New Delhi | PCP Dte. | on or before 25-11-2011 upto 15:00 hrs |
| No.LKD/DB/NIT-NIQ/2010-11/3984-91 Dt 16.11, 2011 | Construction of telemetry Tower at CWC site K.Agraharam under MKSD-II, Kurnool | Lower Krishna Division, Hyderabad | on or before 25.11.2011 by 1500 hrs. |
| No.LKD/DB/NIT-NIQ/2010-11/3976-83 Dt 16.11, 2011 | Construction of telemetry Tower at CWC site T. Ramapuram under LTSD, Kurnool | Lower Krishna Division, Hyderabad | on or before 25.11.2011 by 1500 hrs. |
| No. 102/06/NIQ/2011/3919-25 Dt.11/11/2011 | Printing and supply of CWC pamphlets & hand bills | P&I Division, Central Water Commission Quarter no: 1061-1064, Type V, NH-IV FARIDABAD-121001(Haryana) | up to 15:00 hrs on 16/11/2011 |
| NO/ JE- HQ/TDS/0409/vol- 26/2011/6021-34 Dated 9.11.2011 | Repair & Maintenance of T&P (Spray painting on steel almirah) | TAPI DIVISION, Opp. Kshetrapal Health Centre,Sagrampura, Surat 395002 | on or before 19.11.11 up to 1500 hrs |
| No. UYD/HQ-15/ 2011/5627-46 Dated 08.11.2011 | Miscellaneous work at Kalindi Bhawan, New Delhi. | UPPER YAMUNA DIVISION Room No 201, Kalindi Bhawan, B-5, Tara Crescent, Q.I.Area, New Delhi-110016 | 18.11.2011 (15:00 hours) |
| --------------------------- | Designing, Printing and Binding of Booklet on "Water Resources at a glance-2012" | Deputy Director (TD), Central Water Commission, Room No. 501(S), Sewa Bhawan R.K.Puram, New Delhi – 110066. | Up to 11/11/2011 (12:00 PM) |
| No. MID/JEHQ-2/2011-12/2132-33 Dt.02/11/2011 | Printing of Technical forms. | MEGHHNA INVESSTIGATIONN DIVISIONN YINNGYAR VILLA, LUMPYNGNGAD, Shillong-793014 | up to 02/12/2011(15.00hrs) |
| No. 7/1/2011-M&A/CWC-Jaipur/41-44 Dt.19/10/2011 | Up gradation of Computers *Extension of Date of Opening | M&A Dte, Room no.-107,Kendriya Sadan, Block-A,Sec.-10,Vidhyadhar Nagar,Jaipur | 03/11/2011(15:00) |
| EE/G/NIQ-MGD3-2011-12/Tender document for cross sectional survey work from Allahabad to Chunar | Carrying out cross sectional survey works at approx. 10 km. apart along the river GANGA from Allahabad to Chunar (Dist. Mirzapur) for Morphological Studies purposes. | MIDDLE GANGA DIVISION – 3 VARANASI | 17.11.2011 AT 3:00 P.M. |
| EE/G/NIQ-MGD3-2010-11/Tender document for cross sectional survey work from Chunar to Buxar | Carrying out cross sectional survey works at approx. 10 km. apart along the river GANGA from Chunar to Buxar for Morphological Studies purposes. | MIDDLE GANGA DIVISION – 3 VARANASI | 17.11.2011 AT 3:00 P.M. |
| No. 5/4/2011-TD/644 Dt. 25/10/2011 | NIT for designing, printing and binding of booklet on Water Resources at a glance - 2012 | T D Directorate | Up to 11/11/2011 (12:00 PM) |
| No. 102/06/NIQ/2011/3654-64 Dt. 15/10/2011 | Up gradation of computers *Corrigendum | P&I Division, Central Water Commission Quarter no: 1061-1064, Type V, NH-IV FARIDABAD-121001(Haryana) |
Up to 22/10/2011 (15.00 Hrs) |
|
No-TDS/01/2011-12
No-TDS/NIT/DB/2011/5987-99 Dated 5.11.2011 |
Construction of Compound wall at site Tapi and Construction of Room for Telemetry System at Burhanpur *corrigendum | TAPI DIVISION Opp. :Kshetrapal Health Centre, Sagrampura, Surat-395 002 | up to 1500 hours of 11/11/2011 |
| No.HGD/HS-3/2011/ Dated:-20/10/2011 | repair of ST (Aluminum) Boat of size 22’X5’.9” available at Rishikesh(G&D) site, CWC | Office of the Executive Engineer Himalayan Ganga Division 7-B, Sewak Ashram Road Dehradun -248 001. | upto 15.30 hrs of 04.11.2011 |
| No. SMD/CWC/IV/2010/2715 Dt.20/10/2011 | NIQ for LAN Connections. | Software Management Directorate ,Room no. 628(S),Sewa Bhawan,R.K.Puram,New Delhi | 31/10/2011 up to 15:00 Hrs |
| No. DD/DB/Tender/2011-12 / 3163-74 dated :-26/ 09/2011 | Construction of cabin at telemetry station Jamalpur | OFFICE OF THE EXECUTIVE ENGINEER DAMODAR DIVISION, APCAR GARDEN (WEST) ASANSOL-713304 | up to 1500 hrs on 18/10/2011 |
| No. DD/DB/Tender/2011-12 / 3184-95 dated :-26/ 09/2011 | Construction of cabin at telemetry station Tilpara | OFFICE OF THE EXECUTIVE ENGINEER DAMODAR DIVISION, APCAR GARDEN (WEST) ASANSOL-713304 | up to 1500 hrs on 19/10/2011 |
| No. UYD/Vehicle/2011/5384-92 Dated: 05.10.2011 | Repairing of Vehicle No. DL-1CG-1120 | UPPER YAMUNA DIVISION Kalindi Bhawan, B-5, Tara Crescent, Q.I.Area, New Delhi-110016 | on or before upto 1500 hrs. on 19.10.2011 |
| No. ERD/AB/NIQ/2011/960-62 Dated : 01-10-2011 | Providing and fixing falls ceiling for CB, Transit rooms and HM section of E.R. Division and library room of Mahanadi Bhawan. *Corrigendum | Office of the Executive Engineer Eastern Rivers Division Plot no.-13&14 Bhoi Nagar Bhubaneswar | on or before 3.00 P.M. of 13-10-2011. |
| No. ERD/AB/NIQ/2011/963-65 Dated : 01-10-2011 | Renovation of toilets rooms and canteen room at Mahanadi Bhawan, CWC, Bhubaneswar. *Corrigendum | Office of the Executive Engineer Eastern Rivers Division Plot no.-13&14 Bhoi Nagar Bhubaneswar | on or before 3.00 P.M. of 13-10-2011. |
| CD/JEQ/C‐8/2010/ Date........ |
Making, Finishing, Supply and loading of square wooden floats including cost of the timber *Notice * Notice II , * Notice III |
केन्िीय जल आयोग, िचनाब मडल 29‐30, गली नम्बर 6, सूरज नगर, तालाब ितल्लो, जम्मू- 180002 | 12.10.2011 upto 1600 hours |
| No. ERD/AB/NIQ/11/7873-76 Dated : 21-09-2011 | Repairing & Renovation of Office Shed at Site Alipingal. | Office of the Executive Engineer Eastern Rivers Division Plot no.-13&14 Bhoi Nagar Bhubaneswar | 03-10-2011 |
| i=kad% exae&2@ ds0t0vk0@ eq0&02@ 2011&12@10201& 06 fnukad% 03@10@2011 | fabrication & supply of Sign board,Notice board,Name plate & Logo | dk;kZy; vf/k'kklh vfHk;ark e/; xaxk eMy&2] dsanzh; Hkou] gky la0&3] f}rh; ry] vyhxat y[kuÅ | fnukad 14-10-2011 dks 03-00 ¼vijkg~u½ cts rd |
| i=kad% exae&2@ ds0t0vk0@ eq0&02@ 2011&12@10101& 04 fnukad% 01@10@2011 | Printing of technical ,official forms & registers. | dk;kZy; vf/k'kklh vfHk;ark e/; xaxk eMy&2] dsanzh; Hkou] gky la0&3] f}rh; ry] vyhxat y[kuÅ | fnukad 14-10-2011 dks 03-00 ¼vijkg~u½ cts rd |
| No. MID/JEHQ-7/2011-12/2056-64 Dt.03/10/2011 | AUCTION NOTICE No. 1/2011-12 | MEGHHNA INVESSTIGATIONN DIVISIONN YINNGYAR VILSHILLOLLA, LUMPYONG-7930 YNGNGAD 14 | up to 04/11/2011(15.00) |
| No. 102/06/NIQ/2011/3307-16 Dt. 30/09/2011 | UP-GRADATION OF COMPUTER | P&I Division, Central Water Commission Quarter no: 1061-1064, Type V, NH-IV FARIDABAD-121001(Haryana) |
Up to 05/10/2011 (15.00 Hrs) |
| No. DD/DB/Tender/2011-12 / 3206-17 dated :-29/ 09/2011 | Construction of Cabin at Telemetry station, Maharo | OFFICE OF THE EXECUTIVE ENGINEER DAMODAR DIVISION, APCAR GARDEN (WEST) ASANSOL-713304 | up to 1500 hrs on 20/10/2011 |
| No. 102/06/NIQ/2011/3413-41 Dt. 30/09/2011 | “Designing and Fabrication of Pavilion for Ministry of Water Resources including Organizing Pantomime Show in IITF 2011” (Hall No. 7E (AC), Pragati Maidan)” from 14th to 27th November, 2011. | P&I Division, Central Water Commission Quarter no: 1061-1064, Type V, NH-IV FARIDABAD-121001(Haryana) | up to 15:00 hrs on 11/10/2011 |
| No.UYD/SSD/Misc./2011/ 5246-66 Dated: 26.09.2011 | Repairing of telemetry station building at Delhi Railway Bridge | Executive Engineer, Upper Yamuna Division | on or before 03.10.2011 upto 15:00 hours |
| No. LGD/W-18/2011/1955-61 Dated: 21.09.2011 | Cancellation of NIQ | Lower Ganga Divisin, Murshidabad | Nil |
| No.D-14016/SR/2011AD-II(S)/2290-2309 Dated: 21.9.2011 | Disposal of old unserviceable T&P articles | 211(S), PCP Directorate Sewa Bhawan, R.K. Puram, New Delhi - 110066 | on or before 29.09.2011 by 3.00 pm |
| No. 24/1/HOC-N/2011-12/2154-69 Dated: 14.09.2011 | “Servicing & Repair of Vehicle No. RJ-14-4C-0689 (Maruti Gypsy)” | Hydrological Observation Circle A – 17, Sector–56,Noida201307 (UP) | on or before23.09.2011 upto1500hrs. |
| No. CD/JEQ/B-6/3153-57 Dt.03/09/2011 | Publication of press notice | Chinab Division 29-30 , Street no.-6 TALAB TILLO Jammu | - |
| No. 102/06/NIQ/2011/3097-3125 Dt. 08 /09/2011 | Engagement of Agency for “Planning, Designing and Fabrication of Ministry of Water Resources Pavilion and Organizing Pantomime Show in IITF 2011 | PLANNING CIRCLE 1065-68/V, NH-4, NIT FARIDABAD PIN - 121001 (HARYANA) | up to 15:00 PM on 26/09/2011 |
| No. UYD/KB- 6/2011/4974-94 Dated 05.09.2011 | work for Cleaning & Sweeping work at Kalindi Bhawan, New Delhi | UPPER YAMUNA DIVISION Kalindi Bhawan, B-5, Tara Crescent, Q.I.Area, New Delhi-110016 | 15.09.2011 (15:00 hours) |
| No. UYD/KB- 4/2011/4953-73 Dated 05.09.2011 | work for Horticulture / Plantation work at Kalindi Bhawan, New Delhi. | UPPER YAMUNA DIVISION Kalindi Bhawan, B-5, Tara Crescent, Q.I.Area, New Delhi-110016 | 15.09.2011 (15:00 hours) |
| No. DD/HQIN|Q/2O1 1 / 3043-53Dated 30.08.11 | construction of cabins at telemetry stations | DAMODAR DlVlSlON, APCAR GARDEN WEST)ASANSOL-713304 | upto15.00hrs.of 08.09.11 |
| No. /W-34/2011/1852-59 Dt.05/09/2011 | Maintenance & security work for Farakka Guest House, SE-5 | Lower Ganga Division 26/1,SS Sen road Berhampore Murshidabad (WB) |
Dt.15/09/2011upto 1500 Hrs. |
| No. DGSD/NIQ-2011/ 331-45 Dated: 03.09.2011 | Construction of WC and Bath at Nanipalsan Site” | DAMAN GANGA SUB DIVISION SILVASSA |
onorbefore14.09.011 upto1500hrs |
|
No.29/08/JE(HQ)/surveyreport /2011/4053-92 Dt.02/09/2011 |
DISPOSAL OF UNSERVICEABLE MATERIAL | PLANNING CIRCLE 1065-68/V, NH-4, NIT FARIDABAD PIN - 121001 (HARYANA) | latestby11.00A.M. on12.09.2011 |
| No. DD/HQ/NIQ/2011/3032-3042 Dated : 29.08.2011. | construction of cabin at Telemetry stations as per Annexure A-1 to A-6 (Copy enclosed) | OFFICE OF THE EXECUTIVE ENGINEER DAMODAR DIVISION, APCAR GARDEN (WEST) ASANSOL-713304 | upto15.00 hrs.of08.09.11 |
| No. ERD/AB/NIQ/11/876-78 Dated : 25-08-2011. | Repairing of Computers, Monitors, replacement of UPS batteries. | Office of the ExecBhubaneswar - 751022 utive Engineer Eastern Rivers Division Prachi Tarangini Bhawan Bhoi Nagar | onorbefore 3.00P.M.of 02-09-2011. |
| No. ERD/AB/NIQ/11/879-82 Dated : 25-08-2011 | Repairing & Renovation of Office Shed at Site Akhuapada. Repairing & Renovation of Office Shed at Site Akhuapada. | Office of the Executive Engineer Eastern Rivers Division Prachi Tarangini Bhawan Bhoi Nagar | onorbefore 3.00P.M.of 02-09-2011. |
| No. ERD/AB/NIQ/11/888-90 Dated : 25-08-2011. | Repair of Air Conditioners) | Office of the ExecBhubaneswar - 751022 utive Engineer Eastern Rivers Division Prachi Tarangini Bhawan Bhoi Nagar | onorbefore 3.00P.M.of 02-09-2011. |
| No. MD/HQ/Misc.Work/ 2011-12/4493-95 Dated. 18/08/2011 | Misc. improvement works at division office under DWRIS (PLAN) | EXECUTIVEENGINEER MAHANADIDIVISIONCWC,BURLA |
DATE:02.09.2011 TIME:13=00hours |
| No. HQ - 2 / MGD-2/CWC/Lko/ 11-12 / | “Repair work at Sub Division, Moradabad office, under Middle Ganga Division – II, CWC, Lucknow” | Office of the Executive Engineer Middle Ganga Division – II Kendriya Bhawan, Hall no. – 3, IInd Floor, Aliganj, Lucknow. | upto1500Hrs.of 30-08-2011. |
| DD/DB/Tender/2011-12/1750-61/ Dt.29/07\2011 | Construction of cabins at sites. | DAMODAR DIVISION, APCARGARDEN(WEST)ASANSOL |
25/08/2011 (15.00 hrs) |
| DD/DB/Tender/2011-12/1869-80/ Dt.03/08\2011 | Maintenance of personal for CWC office building & complex , salt lake Kolkata | DAMODAR DIVISION, APCARGARDEN(WEST)ASANSOL |
25/08/2011 (15.00 hrs) |
| DD/DB/Tender/2011-12/1520-31/ Dt.06/08\2011 | Construction of site office & Extension of site office | DAMODAR DIVISION, APCARGARDEN(WEST)ASANSOL |
25/08/2011 (15.00 hrs) |
| No. 102/06/NIQ/2011/ | AUCTION NOTICE | P&I Division, Central WaterCommission Quarter no: 1061-1064, Type V, NH-IV FARIDABAD-121001(Haryana) | on or before 27-08-2011 at 15:00 hrs. |
| No. ERD/AB/NIQ/11/6420-23 Dated : -08-2011 | Repair of Steel Boat including cost of material, fittings, replacements, T&P, servicing and labor charges etc. complete and transportation at site Jenapur, Dist : Jajpur | Prachi Tarangini Bhawan Bhoi Nagar Bhubaneswar - 751022 | on or before 3.00 P.M. of 22-08-2011. |
|
No. 106/01/SR/2011-12/
No. 102/06/NIQ/2011/ |
the auction of Jeep No. HYW-1843”. | Planning & Investigation Division NH.IV, Faridabad | upto 15:00 Hrs. of date 20-08-2011 |
| No. ERD/HQS-8/11/6261-70 fnukad % 06-08-11 | AUCTION SALE NOTICE | Eastern Rivers Division Bhoi Nagar Bhubaneswar | 16-08-2010 At 1500 Hr |
| No. DD/DB/Tender/2011-12 /1648-59 dated :- 25 / 07/2011 | Construction of Cabin at Sites | DAMODAR DIVISION, APCARGARDEN(WEST)ASANSOL | upto 1500 hrs on 18/08/2011 |
| No.9/3/2006-RDD/3130-37 | Auction Notice |
RIVER DATA DIRECTORATE |
on 8/08/2011 upto 15:00 hrs |
| No.UYD/Computer/2011/3924-32 Dated, 28.7.11 | upgradation of Computers. | UpperYamunaDivisionKalindiBhawan, B- TaraCrescentQutabInstitutionalArea,NewDelhi | on or before 11.08.2011 upto 15.00 hours |
| ERD/HQS-8/11/5723-36 Dt.23/07/2011 | Auction Sale Notice | Eastern Rivers Division BhoiNagar Bhubaneswar | 25/07/2011 up to 1500 Hrs |
| NoDD/DB/Tender/2011-12/1569-80 Dt.18/07/2011 | dismantling &reconstruction of roof for office building at Midnapore | DAMODAR DIVISION, APCAR GARDEN (WEST) ASANSOL-713304 | 05/08/2011up to 1500hrs |
|
la0%24@1@ HOC-N@2011&12@1707-18 |
Miscellaneous Civil work | Hydrological Observation Circle Noida | 04-08-2011 (16:00 hours) |
|
la0%24@1@,p-vks-lh-&uks@2011&12@1723&33 |
Providing & fixing of Compressor | Hydrological Observation Circle Noida |
08.08.2011
|
|
No. MD/HQ/Misc.Work/ 2011-12/ 4049-52 |
MISC . IMPROVEMENT WORK AT DIVISION OFFICE UNDER DWRIS (PLAN) |
MAHANADI DIVISION, DOCTOR.S COLONY, BURLA |
06.08.2011 13:00 Hrs |
| No.SR/1001/CE/1298-1301 Dt.27/07/2011 | AUCTION SALE NOTICE of Unserviceable T&Particles | Mahanandi&EasternRiverOrganisation BhoiNagarBhubaneswar |
12-08-2011 1500 Hrs |
| i=kad% e-x-e&2@y[k-@eq0&1@2011@56+25 - 32 fnukad 25 – 07 - 2011 | ty izokg ekfi;ksa dh ejEer ,oa jh&jsfVax dk dk;ZA |
dk;kZy;vf/k’kklhvfHk;arkdsanzh;Hkou] f}rh;ry]gkyla0&3]vyhxaty[kuÅ |
fnukad 09-08-2011 dks 03-00 ¼vijkgu½ cts rd |
|
No. DD/DB/Tender/2011-12 / 1513-24 dated :-15/ 07/2011 No. DD/DB/Tender/2011-12 / 1496-1507 dated :- 05 / 08/2011
|
Construction of boundary wall at Tantloi site | DAMODAR DIVISION, APCAR GARDEN (WEST) ASANSOL-713304 |
upto 1500 hrs on 05/08/2011 Up to 15.00 Hrs. on 18/.8/2011 |
| No.DD/HQ/NIQ/2010-11/1414-22 Dated 12 /07/11 | Providing, fitting and fixing of Iron Gate at Midnapore. |
DAMODARDIVISION,APCARGARDEN(WEST) ASANSOL-713304 |
up to15.00 hrs .of 21.07.11 |
| Tender No: ERD/AB-2/NIT/(VEHICLE)/2011-12/842-45 Dt. 07-07-2011 | work of Supply, operation & maintenance of One No. Ambassador- Classic - Mark-4 or equivalent along with driver | EASTERN RIVERS DIVISION, CWC, BHUBANESWAR | not later than 15.00 Hrs on 25-07-2011 |
|
No.BIDIHQ/SRIAuction-l7/2010-11/898-909 |
Auction of Old and Unservicable Vehicle | Bhutan Investigation Division | By 13.00Hrs on 09/08/2011 |
| No.03/AD-II (HQ)/ Emb. (NW&S)/PCP/2010-11/910-922 | NOTICE INVITING TENDER FOR RENOVATION O/O THE CE (NW&S) & Emb. Dte. ROOMS, CWC, WEST-BLOCK -II, R.K.PURAM, NEW DELHI |
PCPDirectorate211(S),SewaBhawan, R.K.Puram,NewDelhi- |
by 1500 Hrs on 15 / 07 / 2011 |
| NIT No. ERD/AB/NIT/2011/4567-70, dt. 29-06-2011 | onstruction of Compound Wall at Site Srikakulam, Dist : Srikakulam, AP. | EASTERNRIVERSDIVISIONPRACHITARANGINI BHAWANBHOINAGARBHUBANESWAR | 11-07-2011 3.00 P.M. |
| No. ERD/HQS-8/11/4731-42 Dated : 05 - 07 -2011. | AUCTION SALE NOTICE of old condemned vehicle | EasternRiversDivision BhoiNagarBhubaneswar | on or before 16-07-2011 at1500hour. |
| CWC/RSD/3/7/2007/6690-93/Dt.01/07/2011 | Sedimentation assesment of 30 reservoir in india thru Remote Sensing technologies | Remote Sensing Directorate | 29/07/2011 |
| HOC/tech-10/2011/2195-98/dt.24/06/2011 | Auction Sale Notice of T&P | HOC,mahanadi bhawanBhoiNagar,Bhubaneshwar | 07/07/2011 16.00 Hrs |
| LGD/w-18/2011/1801-07/dt.4.07.11 | Cancellation of NIQ | Lower Ganga Divisin, Murshidabad | Nil |
| No. DD /HQ/NIQ/2011-12/ 1368-78 Dated 18/06/2011 | Construction of Water Tank at Konar | DAMODARDIVISSION, APCARGARDEN(WEST)ASANSOL | up to15.00hrs. of 07/07/2011 |
| No.Y-23/UYD/2010/54-67 Dated 23.06.2011 | Establishment of gauge site (near road bridge) at Mohna Site | Lower Yamuna Sub Division New Delhi | 06.07.2011 upto 15.00 hours |
| No.M&A/GT/SR/2011/429-33/ Dt.23/6/2011 | Auction Sale Notice | Bhoi Nagar, Bhubaneshwar | 08/07/2011 15.00 Hrs. |
| No.UYCR/MISC./2010/ 191-204 Dated-20.06.2011 | Making/Manufacture & supply of wooden Gauge post | UPPER YAMUNA CONTROL ROOM DEHRADUN | 29.06.2011 upto 15:00 hours |
| 26/1/HOC-N/2011-12/402-17 | NIT for Auction notice | HOC Noida | 05/07/2011 up to 15.00 hrs |
| No.HGD/HS-3/2011/886-95 | labour rate contract for Deployment of M. V. Driver | HimalayanGangaDivision Dehradun | 28.06.2011 up to 15.00 Hrs. |
|
UYD/KB-8/2011/3355-76 |
NIT for Kalindi Bhawan Security | UPPER YAMUNA DIVISION | 08/07/2011 |
|
UYD/KB- 8/2011/3377-97 |
NIT for Telesecurity |
UPPER YAMUNA DIVISION |
06/07/2011 |
|
DD/DB/Tender/2011-12/ 1272-83 DD/DB/Tender/2011-12/1903-17/ Dt.03/08\2011 |
Repairing of H.O.Circle building | DAMODAR DIVISION, APCAR GARDEN (WEST) | 07/07/2011 |
| TDS/JEHQ/0409/2011/ 2406-21 |
Providing skilled manpower assistance service for collection of hydro meteorological data |
TAPI DIVISION |
28/06/2011 |
|
LKD/DB/Outsourcing/2011-12/2097-2104 |
Providing Semi-skilled man power Services |
Lower Krishna Division Hyderabad-4 |
29/06/2011 |
|
ERD/AB/NIQ/11/791-94 |
Boundary wall and platform for rainfall observatory | Bhoi Nagar, Bhubaneshwar | 18/06/2011 |
|
ERD/AB/NIQ/11/787-90 |
Erection of ORG Fencing | Bhoi Nagar, Bhubaneshwar | 18/06/2011 |
|
No.LKD/DB/House Keeping/2010-11/635-41 |
Krisna Godavari Bhawan, Hyderabad | ||
| LGD/W-15/2011/413-21 | Data Entry operator cum Typist on computer. | Lower Ganga Division. | |
|
la0%24/1 /HOC-N/2010-11/515-33 |
Construction of Working Bench at National Regional Water Quality Laboratory |
Hydrological Observation Centre, Noida |
22.06.2011 |
| 26- 05 -2011 ERD/HQS-8/11/741-53 Dt.26- 05 -2011. | Easternivers Division Bhubaneswar | 30-06-2011 1500hour. | |
| UYD/HQ-15/ 2011/3116-35 dt. 04/ 06 /2011 | UpperYamunaDivision,Kalindi Bhawan,NewDelhi | 14.06.2011 (16:00hours) | |
| No. UYD/HQ-15/ 2011/3017-34 |
Re-installation of Cable Way system & Miscellaneous work at G&D site Bausan (Uttrakhand). |
UpperYamunaDivision,Kalindi Bhawan,NewDelhi | 14.06.2011 (16:00hours) |
| No-TDS/V/WL/VOL-10/2011/ | TAPI DIVISION | 07/06/2011 | |
| HGD/TELEMETRY CABIN/1 | UTTARKASHI SITE OFFICE | 03/06/2011 | |
| NO/ TDS/ JE-HQ/0409/vol-26/2011/2527-39 | TAPI DIVISION | 02.06.11 | |
| No.LKD/DB/House Keeping/2010-11/635-41 |
Providing House-Keeping Services to CWC Office Complex “Krishna Godavari Bhawan” |
Lower Krishna Division,Hedrabad | 27/05/2011 |
| CD-J/HQ-61/2007/ |
MAINTENANCE CONTRACT OF VSAT SYSTEM, INCLUDING NETWORK ACCESS SERVICES |
Chambal Division |
28/5/2011 |
| ERD/AB/NIT/2011/703-705, dt. 28-04-2011 | CONSTRUCTION OF BOUNDARY WALL AT SITE GHATSILA, DIST : SINGHBHUM. | Bhoi Nagar, Bhubaneswar | 16/05/2011 |
| 01/LYD/AGRA/@)!!-!@/LYSD-3/Hamirapur/134-40,Dt.09/05/2011 | Civil works as per enclosed list | LYSD-3,Hamirpur | 20/05/2011 |
| 102@06@NIQ@2010@ | “Preparation of High Definition (HD) format documentary film in Hindi and English on “Water Conservation and Water Use Efficiency” | P&I Div. Faridabad | 01/06/2011 |
| ERD/AB/NIQ/11/699-702 | Repair of Steel Boat including cost of material, fittings, replacements, T&P, servicing and labor charges etc. complete and transportation at site Adityapur, Ghatshila and Muri (3 sites). | Bhoi Nagar, Bhubaneswar | 12/05/2011 |
| ERD/AB/NIQ/11/690-92 | Renovation of Toilet Rooms at Vamsadhara Sub-Division,CWC, Ambapua, Berhampur, Orissa. | Bhoi Nagar, Bhubaneswar | 12/05/2011 |
| ERD/AB/NIQ/2011/667-69 | Preparation and binding including all material and labour (Xerox, color print, numbering etc. complete.) | Bhoi Nagar, Bhubaneswar | 12/05/2011 |
| ERD/AB/NIQ/11/ 687-89 | Boundary wall and platform for rainfall observatory at GDSQ Site Jenapur | Prachi Tarangni Bhawan Bhubaneswar | 12/05/2011 |
| ERD/AB/NIQ/10/696-98 | Erection of ORG Fencing at sites - Adityapur, Ghatsila and Jamsholaghat | Prachi Tarangini Bhawan, Bhubaneswar | 12/05/2011 |
| 24@1@HOC-N@2011&12@1097&1106 | Providing & Fixing Aluminum framing with glass and vertical blind | HOC Noida | 18/05/2011 |
|
No. DD/DB/Tender/2011-12 /401-12 |
DAMODARDIVISION, APCARGARDEN(WEST)ASANSOL- | 10/05/2011 | |
|
No. DD/DB/Tender/2011-12 /474-85 |
DAMODARDIVISION, APCARGARDEN(WEST)ASANSOL - |
11/05/2011 | |
|
No. 09W/04/10/HQ-MD/ 709-30 |
Quotation for Printing of Hydro metrological data forms ®isters |
Mahi Division |
30/04/2011 |
| No-TDS/V/0409/VOL-10/2011/ 1822-34 | Tapi Division, Surat | 29/04/2011 | |
| No-TDS/01/2011-12 | Construction of Musto Type Bench Marks on River Tapi | Tapi Division, Surat | 02/05/2011 |
| SHD/CWC/325/2011/662-68 | Annual Maintenance Service for Photocopier Machine |
Snow Hydrology Division, Shimla |
29/04/2011 |
| 09W/04/10/HQ-MD/709-30 | Printing of Hydro metrological data form and registers. | Mahi Division, Gandhi Nagar | 30/04/11 |
|
No.3/1/2011-RDD/1609-10 |
HIRING OF COMMERCIAL TAXI ON 24X7 DAYS BASIS for the period from 15.05.2011 to 31.10.2011” |
RD Dte, CWC, New Delhi | 20/04/2011 |
| No.D-14016/SR /2010-AD -II(S)/1995-2011 | Disposal of old unserviceable T&P articles (Furniture/Bateries /Typewriter/ Misc items) of CWC, New Delhi. | PCP Dte, CWC, New Delhi | 18/04/2011 |
|
BID/HQ/SR/Auction-17/2010-11/375-86 |
Public auction of the old and unserviceable vehicle No. DL-1L-A-5489 (DCM Toyota) |
Bhutan Investigation Div. | 30/04/11 |
| SID/DB-7(1)/Tender/2010-2011 |
Construction of drift of 30m length with cross-end at right abutment of dam site of Kalez Khola H.E. Project, West Sikkim *The date of opening is extended by 11/04/2011 |
Sikkim Investigation Div. | 06/04/11 |
| 3/1/2009-RDD/1220-22 | Hiring of three nos Private Vehicles with driver | River Data Dte | 29/04/11 |
| LGD/W-15/2011/608/2 | Sweeping of office floor, dusting of table, chairs, cleaning of bathroom and toilets | Lower Ganga Divisin, Murshidabad | 02/04/11 |
| CD/JEQ/UMP/C-15/2010 | Chenab Division, Jammu | 08/04/11 | |
| CD/JEQ/ UMP/C-17/2010 |
Topographical Survey Work for Command Area of Ujh Multipurpose Project in Distt. Kathua, J&K |
Chenab Division, Jammu | 08/04/11 |
| CD/JEQ/UMP/C-16/2010 | Geo-Technical Investigation (Drilling) at Ujh Multipurpose Project | Chenab Division, Jammu | 08/04/11 |
| 4/21/2009-RDD | Providing Data Entry Operator and Multi Tasking Staff services to River Data Directorate, CWC | River Data Directorate | 30/03/11 |
| Y-23/UYD/2010/1678-88 | Installation of False Ceiling at Mathura Site (Gokul Barrage) | Upper Yamuna Div, New Delhi | 28/03/11 |
| CWC/SMD/IV-10/2011/1129-30 | Disposal of old unserviceable/empty articles of CWC | Software Management Dte | 29/03/11 |
| 5/14/ MGD-3/Varanasi /10-11 /1805-10 | Consturction of hutment at gauge, discharge, silt and water quality site Shazadpur (Kaushambi)UP | Middle Ganga Div-3, Varanasi | 21/03/11 |
| 5/14/ MGD-3/Varanasi /10-11 /1817-22 | Construction of boundary wall at gauge, dischrge, silt and water quality iste, Shahzadpur (Kaushambi), UP | Middle Ganga Div-3, Varanasi | 21/03/11 |
| 5/14/ MGD-3/Varanasi /10-11 /1811-16 | Construction of hutment at Gauge, discharge, silt and wate quality site, Maighat, Jaunpur, UP | Middle Ganga Div-3, Varanasi | 21/03/11 |
|
13/2010-11/MGD-1-Lko.- HQ-2/ CE Office/ 1146-52 |
Floor Tiling Work at Office Building of the Chief Engineer, UGBO,CWC,Lko | Middle Ganga Div-1, Luckow | 17/03/11 |
|
10-25/DC /PCP/2010-11/449-65 |
Providing & fixing of wood wool pad in Desert Cooler at CWC (HQ) | PCP Dte, CWC, New Delhi | 17/03/11 |
| 02/06/NIQ/2011 | Design, Fabrication & Printing of Display material in CWC Engineering Museum | Planning & Investigation Div. Faridabad | 17/03/11 |
| 5/14/ MGD-3 /Varanasi / 2010-11 /1249-54 | CONSTRUCTION OF BOUNDRY WALL AT GAUGE, DISCHARGE, SILT AND WATER QUALITY SITE, MAIGHAT (JAUNPUR), U.P | Middle Ganga Division-3, Varanasi | 10/03/11 |
| 14014/25/2010-SDO(HQ)/ | Designing, printing and binding of publication “Water and related statistics- 2010” | SDO(HQ), PCP, Dte, CWC | 09/03/11 |
| LYSD-2/Agra/HQ/8/11/181/196 | Lower Yamuna Sub Division, Agar | 15/03/11 | |
| LYD/Agra/HQ/I/1/6/2010-11958/73 | Dust Proofing of Bacteriological Lab | Lower Yamuna Division, Agar | |
| 7/LYD/AGRA/2010-11/ 1013-1029 | Round the clock Watch and Ward services | Lower Yamuna Division, Agra | 18/03/2011 |
| 10-25/DC /PCP/2010-11/272-283 | Paintings & Providing, fixing of 4mm thick good quality Ply in Desert Cooler installed at various floor of Sewa Bhawan, West Block-I & II and New Library Building, R.K.Puram,New Delhi | PCP Dte, New Delhi | 03/03/11 |
| 02/2010-11 | Laying GI Pipeline, Renovation work of CE ofice and SE office chambers of BRB Jhansi | Betwa River Board | 03/03/11 |
| Mu-2/MGD-1/CWC/Lko/20-11/743-49 | Advertisement through Hoarding | Middle Ganga Div-1, Lucknow | 22/02/11 |
| SID/HQ-22/NIT-02/2010-11 | Condduction Topographical Survey, construction of Drift of 30m and Conduction EIA *Click here to see Corrigendum | Sikkim Investigation Div, Gangtok | 24/02/11 |
| 12/10-11/MGD-1/Lko/HQ/2/731-36 | Printing of posters, pamphlets, Leaflets, Folders, stickers, Banners etc. | Middle Ganga Div-1, Lucknow | 24/02/11 |
| 5/14/ MGD-3 /Varanasi / 2010-11 / 918-23 | Construction of boundary wall at Balia See Corrigendum | Middle Ganga Div-3 | 24/02/11 |
| 5/14/ MGD-3 /Varanasi / 2010-11 / 912-17 | Construction of boundary wall at Chopan, Sonebhadra | Middle Ganga Div-3 | 24/02/11 |
|
5/14/ MGD-3 /Varanasi / 2010-11 / 906-11 |
Construction of boundary wall at Sidhi, MP | Middle Ganga Div-3 | 24/02/11 |
|
LGD/W-15/2011/295-99 |
Sweeping of the floor, dusting | Lower Ganga Division, Murshidabad | 18/02/11 |
| 14016/2/clng./2010-SDO(HQ)/ | Cleaning work of service portion of CWC HQ) Building, Sewa Bhawan, R.K.Puram, New Delhi | PCP Dte, New Dehli | 18/02/11 |
| 6/LYD/Agra/2010-11 | Construction of Room of Laboratory at Dholpur site | Lower Yamuna Sub Division, Agara | 18/02/11 |
| MAS/T&P/344/99/Vo-V/282-84 | Upgradation of Computer | Monitoring & Appraisal Dte, Agra | 10/02/11 |
| MID/JEHQ-1/2010-11/68-74 | Installation of gauge post at G&D site Fakirabazar | Meghna Investigation Division, Shillong | 23/02/11 |
| MID/JEHQ-1/2010-11/96-102 | Installation of gauge post at G&D site Fulertal | Meghna Investigation Division, Shillong | 23/02/11 |
| MID/JEHQ-1/2010-11/54-60 | Installation of gauge post at G&D site Gumra Bazar | Meghna Investigation Division, Shillong | 23/02/11 |
| MID/JEHQ-1/2010-11/75-81 | Installation of gauge post at G&D site Dholai | Meghna Investigation Division, Shillong | 23/02/11 |
| MID/JEHQ-1/2010-11/61-67 | Installation of gauge post at G&D site Matijuri Ghat | Meghna Investigation Division, Shillong | 23/02/11 |
| MID/JEHQ-1/2010-11/82-88 | Installation of gauge post at G&D site AP Ghat | Meghna Investigation Division, Shillong | 23/02/11 |
| MID/JEHQ-1/2010-11/89-95 | Installation of gauge post at G&D site BP Ghat | Meghna Investigation Division, Shillong | 23/02/11 |
| 1/2010-11/MD/GNR | Construction of compound wall at Mahi Sub Division, Kadana, Distt Panchmahal (Guj) | Mahi Division, Gandhi Nagar | 11/02/11 |
| 5/LYD/AGRA/2010-11/SBSD/Jhansi | Construction of building for telemetry station at site Gaurrauli Disstt, Chatarpur, (MP) | Sindh Betwa Sub Division, Jhansi | 11/02/11 |
| CWC/SHD/2010-11/2 | Engaging manpower for the services of Unskilled/Clerical and non-Technical Supervisory Staff at various Hydrological Observation sites under the administrative control of the Executive Engineer, Snow Hydrology Division, Shimla | Snow Hydrology Div, Shimla | 05/02/11 |
| 4/LYD/AGRA/2010-11/394-400 | Construction of building for telemetry station at Jhansi | Lower Yamuna Division, Agra, | 07/02/11 |
| 228/7/Tech/HOC/175-81 | Providing supplying & printing of posters, stickers etc. | Hydrological Observation Circel | 02/02/11 |
| 09/2010 - 11/MGD-1-Lko.-HQ-2/ GONDA | Construction of hutment at Gonda | Middle Ganga Div, Lucknow | 28/01/11 |
| MID/JEHQ/2010-11/125-131 | Manufacturing and supply of wooden gauge posts | Meghna Investigation Division, Shillong | 10/02/11 |
|
CWC/SHD/2010-11/
|
Snow Hydrology Division, Shimla | 05/02/11 | |
|
08/2010-11/MGD-1-Lko.- HQ-2/ Haldwani / 215-20 |
Middle Ganga Division, Lucknow | 25/01/11 | |
| 5/43/2011-PCP/74-77 | Providing and installation of MDF Boxes, I/O Boxes and laying of cables | PCP Dte, CWC | 20/01/11 |
|
14016/2(i)/clng./2010-SDO(HQ)/ |
Internal cleaning of CWC (HQ) offices at Sewa Bawan, R.K.Puram, New Delhi | PCP Dtec, CWC | 21/01/11 |
|
MD/ HQ/2010-11/ 425-29 |
Providing Motor Vehicle Driver for Central Water Commission.s office |
Mahanadi Division, Burla,Sambalpur | 25/01/11 |
|
D-14016/SR /2010-AD -II(S)/1178-92 |
Disposal of old unserviceable T&P articals (Furniture) of CWC, New Delhi. |
PCP Dte, CWC, New Delhi | 19/01/11 |
| D-14016/Fur-Rep/2010-AD-II(S)/1162-76 | Repair of furnitures | PCP Dte, CWC, New Delhi | 17/01/11 |
|
MD/HQ/Tender/ 2010-11/127-31 |
CONSTRUCTION OF PARTITION COMPOUND WALL AT MAHANADI DIVISION CWC :BURLA *Click here to see Corrigendum |
MAHANADI DIVISION, CWC, BURLA |
13/01/11 |
|
MD/HQ/Tender/ 2010-11/ |
CONSTRUCTION OF RAISING HINGT, PLASTERING&FINISHING OF EXISTING COMPOUND WALL AT SITE : PENDRA ROAD |
MAHANADI DIVISION, CWC, BURLA
|
13/01/11 |
|
2/MGD-II/CWC/LKO/HQ-21/2010-11/51-58 |
Middle Ganga Div-II, Lucknow | 15/01/11 | |
| TBO/Tech-56/2009-10 | Designing, printing / fabricating & supplying of publicity / display material | Teesta Basin Organization | 28/12/10 |
| TDS/NIT/Telemetry_Room/ 2010/ 2406-18 | Construction of Telematery Control Room | Tapi Division, Surat | 31/12/10 |
|
03/AD-II(HQ)/NW&S/PCP/2009-10/187-200 |
RENOVATION OF CWC OFFICE, CMDD (NW&S) Dte. AT GROUND FLOOR, WING -2, WEST-BLOCK -II, R.K.PURAM, NEW DELHI | PCP Dte | 27/12/10 |
| 3/2010-11/LYD/SB/JHS/700-705 |
Construction of Telemetry Shed at Gauge site, Nautghat (M.P.) |
Sindh Betwa Sub Division, CWC, Jhansi | 07/01/11 |